Jump to content

Incorrect Improvement Descriptions


The Titan
 Share

Recommended Posts

image.png.09612965f38bc30a5c62a4babdf7f35a.png

As you can see, the oil refinery description says it consumes 3 oil per day. So at 5*3 it should be consuming 15 oil.

image.png.55a121cc11e67c5911a8ae8b321c8391.png

The oil well says it produces 3 tons per day. So at 10*3 it should be producing 30 oil.

 

But my revenue shows a break even. I think the calculation is correct with the changes. It is the improvement description that needs to be updated
I will graciously accept my Orbis Hero achievement now 😂

Edit: This needs to change for all the improvs it looks like

Edited by The Titan
  • Upvote 1

Peace in our time

Link to comment
Share on other sites

  • Developer

Just looked through the code and tested it on the test server, it looks to line up perfectly with what the page says. If you have the Emergency Gasoline Reserves project then that will artificially and externally boost your gasoline production and usage by two, which will make it line up with what your revenue page says.

image.png

  • Upvote 2
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use and the Guidelines of the game and community.