Project: Solar Energy
Requirements: Over 50,000 land, Green Technologies project
Cost: $400,000,000, 30,000 Aluminium
Effect: City power needs are covered to an infrastructure level equal to 25% of land level, farms provide 50 power generation
Project: Full Grid Decarbonisation
Requirements: Solar Energy project, Advanced Engineering Corps project, no Coal or Oil Power Plants
Cost: $500,000,000, 40,000 Aluminium, 20,000 Steel
Effect: City power needs are covered to an infrastructure level equal to 75% of land level, Wind Power Plants are twice as effective, decreases the pollution created from Manufacturing improvements by 25% (stacking with Green Technologies project). Cannot use Coal or Oil for power generation.